Project

Home / Project / Utah Point Berth Project
  • Port Hedland Port Authority
  • Port Hedland, WA
  • Jan 2010 – May 2011
  • 78 million
  • 253,000

Project Overview

To meet the increased demand of bulk commodity exports, the Port Hedland Port Authority developed a multi user port facility on Finucane Island involving:

  • All site infrastructure including substations, control rooms, offices, workshop and amenities
  • A multi-user stockyard facility at Utah Point for truck dumped ore handling
  • An overland conveying system from stockyard to shiploader
  • A state of the art material sampling facility
  • A new wharf at Utah Point to accommodate Panamax vessels
  • A multi-product shiploader and tripper

Scope of Work

In order to facilitate these works, ECM was contracted to complete:

  • Project and construction management of all SMPEI works
  • Design management – detailed design of structural steel, modular buildings, tanks and truck wash
  • Construction works for all electrical, instrumentation, communications, fire detection and security works on the Utah Point site
  • Commissioning
Download